Executed Project & Services


Summary of our Major Executed Projects – K.S.A.

S/No.

Description of Project

Client & Location

Year

Value of Project

1.

Fabrication of Cooling Tower and Reminerlization Plant ‘s  Steel Structure Works Silos, 3 Sedimentation and 3 Used backwash tanks, sludge handling system and their pumping station along with FRP pipelines installations with Pipe Supports.

Moh’d Abdulmohsin Kharafi Sons Co.  Riyadh - KSA

74.6 MIGD Jubail Product Water Expansion Project, SWCC – Jubail.

 2003

to

2004

(partially)

2.500

million

2.

Construction of Private Buildings complete with finnshing stones installation for 15,00 sm² areas

Mohd. Hussain Al-Orainey Est.  – Khobar

2003

To

2005

1.750

million

3.

Design, Fabrication and site erection of steel structural sheds, tanks, vessels, foundations for their equipments and  maintenance projects.

United Lube Oil Company (Pvt.) Ltd. – Ind. City Jubail

Saudi Arabia.

(frequently awarded)

2003

To

2005

(partially)

0.542

million 

4.

Fabrication & Erection of piping & equipments with saddle supports at site.

TAYF –INDUSTRIAL CITY JUBAIL. Registered as sub contractors

 2005

To

2005

0.250

million

5.

Fabrication and Installation of high pressure Fire Fighting pipe lines about 6200 dia inch.

DLPS – Abqaiq / Jubail, Client for

SWCC – Jubail

2005

To

2005

1.550

million

6.

Fabrication of Grating, Hand rails, ladder and cages of Equipments and chemical storage tanks.

Gulf Steel Works – Jubail

2005

To

2005

 1.500

million

7.

Fabrication and Installation of Exhaust Fume System including duct work w/ supports.

TAYF – INDUSTRIAL CITY JUBAIL

2006

To

2006

0.155

million

8.

Fabrication of S.S. Vessels about 50 ton for Instrumentation Air sytem.

United Lube Oil Company (Pvt.) Ltd. – Ind. City Jubail Saudi Arabia.

2006

To

2007

 

0.750

million

 

9.

Fabrication and Erection of 2” dia. C.S. pipe lines for asphalting on pipe rack permanent and temporary tie-in connection in emergency shutdown

About 1500 dia. inch

10.

Fabrication of high pressure vessel 120 ton for Sulfer converter for khursaniyah

INMA Steel Industry – Jubail through Zain Steel Industry.

2006

To

2007

 1.253

million

12.

Civil Work for concrete structure and block w/ painting.

AZMEEL Contr. & Const. Co. – Jubail 

2006 –

2006

0.255

Million

13.

Fabrication of Platforms, Steel Structure Buildings and Pipe Racks with supporting beams & accessories 190 Ton

AK Group – Jubail for Qatar Project

2005

To

2006

 1.565

million

14.

Fabrication, Blasting and painting of Steel structural posts having 2000 ton load capacity. Depending on EA 25 ton appx.

ART Industrial Supports Services – Jubail for HADEED

 2006

To

2006

1.450

million

15.

Pipe and Saddle Supports 75 Ton for Desalination Plant – Mitsubishi and Safco Shut Down Projects.

Al- Gaswa Supports Pvt. Ltd. (GSCO Jubail) for Mitsubishi Projects.

2007

To

2007

1.100

million

17.

Fabrication and Erection of 15mm upto 125mm dia. S.S. & C.S. pipe lines for steel forging machinery tie-in connection in production area about 2500 dia. Inch.

Kalma Cont. Est. – Jubail for United Gulf Steel Industry Pvt. Ltd.

 2007

To

2007

0.453

million

18.

Construction of Private Buildings complete with finnshing for 25,00 sm² areas.

Al Mubaraz Cont. Co.  – Al Ahsa Near Rashid Mall

2006

To

2007

 0.653

Million

19.

Supply & Fabrication of Steel Structural Building and S. S. and C. S. Piping about 5500 Dia Inch for Hassad / JANA Project

Technical Sources for JANA Epoxy Plant - Jubail

2007

To  continue

 1.467

million

20

Civil Work for Suwaidi Camp 1 fnshing (Tile & Plastering  Work) and Internal/External painting.

Al-Zahrani Trad. & Cont. Co. - Dammam

2007

to

2007

0.350

million

21

Supply & Fabrication of Steel Structures & Embedments/ Templates & Base Plates for Huyndai – Marafiq Project

Al- Gaswa Supports Pvt. Ltd. (GSCO – Jubail) for Mitsubishi Projects.

2007

To

2008

 0.860

Million

22

Fabrication & Installation of Thermowall C.S. & S.S. Pipe Line about 3000 Dia Inch.

Gulf packaging Industries Ltd. Co.

Jubail Ind. City

2007

To

2007

 0.825

Million

23

Supply & Fabrication of S.S. Ducts for Bruckner Machine ‘s Fume Exhausting System

Gulf packaging Industries Ltd. Co.

Jubail Ind. City

2007

To

2007

 0.425

Million

24

Supply & Fabrication of Stainless Steel 316L & C.S. Embedments, Templates, Structural Supports & Embedment Items for R.C. Industrial Facilities Projects.

AL-HARBI Trading & Contracting Company

Riyadh – Jubail R.C. Projects.

 2007

To

2008

1.500

Million

25

Supply and Fabrication of Marafiq Tanks PlatForms, Structure, Handrails, Ladders and Site Facilities Steel Goods.

DONG SUNG Saudia

Al-Khobar – Jubail Hyundai – Marafiq Project

2007

To

2008

1.900

Million

26

Fabrication of Equipments Platforms, Structure, Handrails & Ladders etc…

SAUDI PAN GULF

Jubail – SABIC

2007

To 2008

0.800

Million

27

Fabrication of Aramco/Sabic Equipments Platform, Handrails, Ladders & Accessories

MISA – Marinetime Industrial Services Arabia Co. Ltd.-Jubail

4/2008 -

5/2008

38,500

SAR

28

Supply & Fabrication of SS-316L Drip Trays for Battery Equipment

Saudi Binladin Group – Sharq 3rd Project

4/2008 -

5/2008

24,960

SAR

29

66” Dia Mitered Elbow with 3 M Pipe in Gr. 70, 100% NDT

Fluor Canada Ltd. – Sipchem Jac Project

4/2008 -

5/2008

94,800

SAR

30

Supply, Fabrication & Installation of Platform for Maintenence Work 5 Units upto 48 Floors

Al-Suwaiket Trand. & Cont. Co. – Khobar at

DEHRAN TOWER

5/2008

To continue

333,450

SAR

31

Supply, Fabrication & Installation of Steel Supports for ELEVATOR upto 48 Floors

Al-Suwaiket Trand. & Cont. Co. – Khobar at

DEHRAN TOWER

5/2008 -

6/2008

75,600

SAR

32

Supply, Fabrication & Installation of 2 nos. Emergency Stair case Haindrails upto 48 Floors

Al-Suwaiket Trand. & Cont. Co. – Khobar at

DEHRAN TOWER

5/2008 – 7/2008

208,000

SAR

33

Supply, Fabrication & Installation of Emergency Platform, Stair case Haindrails upto 4 Floors

Al-Suwaiket Trand. & Cont. Co. – Khobar at

Euro Village Office Building # 01 - KENT

7/2008 – 8/2008

37,263

SAR

34

Supply, Fabrication & Installation of Platform for Maintenence Work 01 Unit upto 48 Floors

Al-Suwaiket Trand. & Cont. Co. – Khobar at

DEHRAN TOWER

11/2008

To continue

94,770

SAR

35

Design, Fabrication, Painting (Chemical Resistance) & Supply of CS Tank for SNF Storage 80m³, API 650, Ø4.5 X 5.2 M Ht.

SFCCL-CHEMANOL Methanol Chemicals Company – Jubail

6/2008 –

7/2008

97,000 SAR

36

Repair of AIR PLENUM Equipment C.S. 4 M x8 M x 4 M

Fluor Canada Ltd. – Sipchem Jac Project

6/2008 -

6/2008

22,000

SAR

37

Design, Supply, Fabrication & Erection of Roof Deck Framing Shed for Multi Purpose Hall Construction Project. 800 m²

Abdul Rahman Hejazi Cont. Est. through main contractor  Al-NABA / Hadeed

4/2008 – 8/2008

184,500 SAR

38

66” Dia Pipe x .375 mm Wall Thk. in Gr. 70, 100% NDT

Fluor Canada Ltd. – Sipchem Jac Project

6/2008 -

6/2008

21,500

SAR

39

Fabrication, Paint of CS – Gr. 70 & SS-316L VENT STACKS without material – 3 Nos.

48” Dia ~ 24” Dia x 61 Mtr. Ht.

Fluor Canada Ltd. – Sipchem Jac Project

7/2008 -

10/2008

824,900

SAR

40

Hydro Testing of Vent Stacks @ 3.5 Bar but tested actually 6 bar

Fluor Canada Ltd. – Sipchem Jac Project

7/2008 -

10/2008

190,100

SAR

41

Fabrication of 20” Dia Pipe x .375 Wall Thk, SS-316L without material on NDT 100%

Fluor Canada Ltd. – Sipchem Jac Project

7/2008 -

11/2008

216,000

SAR

42

Supply & Fabrication of Vortex Reducers – 3 nos. 1220x600x5mm

SFCCL-CHEMANOL Methanol Chemicals Company – Jubail

9/2008 –

9/2008

 

4,600 SAR

43

Supply, Fabrication, Painting & Erection of Steel Structure Shed 700m² for Private Saudi Owner in Light Industrial Area - Jubail

Mulaq Abdul Rahman Al-Otaibi – Saudi Work Shop Owner

9/2008 – 12/2008

128,000  SAR

44

Supply, Fabrication, Painting & Installation of Fire Fighting Water Service Piping for Office/ Factory

Energy Engineering Services – VESSEL HEAD Factory Jubail

11/2008 – to continue

105,000

SAR

45

Supply, Fabrication, Painting & Installation of LPG GAS Piping for Furnace Supply.

Energy Engineering Services – VESSEL HEAD Factory Jubail

12/2008 – 12/2008

6,130

SAR

46

Supply, Fabrication, Painting & Installation of Fire Fighting Water Service Pump Pit Headers

Energy Engineering Services – VESSEL HEAD Factory Jubail

11/2008 – to continue

25,000

SAR

47

Supply, Fabrication & Installation of Platform for Maintenence Work 02 Unit upto 48 Floors

Al-Suwaiket Trand. & Cont. Co. – Khobar at

DEHRAN TOWER

01/2009

To 01/2009

58,050

SAR

48

Supply, Fabrication & Installation of Emergency Platform, Stair case Haindrails upto 4 Floors

Al-Suwaiket Trand. & Cont. Co. – Khobar at

Euro Village Office Building # 02 - KENT

1/2009 – 1/2009

37,100

SAR

49

Fabrication & Installation of LPG Piping & Equipments for Saudi paper Mills Dammam II Ind. City

Industrial Energy Services for LPG Systems - Dammam

2/2009 – 2/2009

83,285 SAR

50

Design, Fabrication, Picklin  & Supply of SS-316L Scrub Water Tank 11.42m³, API 650, Ø2.5 X 3.2 M Ht.x6 mm thk.

SFCCL-CHEMANOL Methanol Chemicals Company – Jubail

3/2009 –

4/2009

106,000 SAR

51

Supply and Fabrication of Standard Galvanized Grating 32x5x30x100mm base on the layout drawings for trench covers

M. S. Al-Suwaidi Industrial Services Co. Ltd. For Saudi Kayan Project

3/2009

– 4/2009

46,125 SAR

52

Supply and Fabrication of Non Standard Galvanized Grating 50x6x30x100mm – 370x1000mm for Lt. Vehicle Trafic Road Covers

M. S. Al-Suwaidi Industrial Services Co. Ltd. For Saudi Kayan Project

 4/2009

To continue

247,000 SAR

53

Design, Supply, Fabrication, Painting and Installation of Building Stair Handrails & Cage Ladders as per SABIC strd's

M. S. Al-Suwaidi Industrial Services Co. Ltd. For Saudi Kayan Project

 4/2009

To continue

89,840 SAR

54

Design, Supply, Fabrication, HHR Paiting & Installation of Fume Heater Chimner 32"x20M Lg.

United Lube Oil Co. Ltd. – UNILUBE for Blending Plant PRJ.

4/2009

-5/2009

 108,000 SAR

55

Fabrication of Platforms, Cage Ladders & Accessories for Vessel Equipments @ Client Shop.

Gulf Heavy Industries Co. – GHI – II for Saudi kayan Project

5/2009 – 5/2009

15,000 SAR

56

Fabrication of Grating Thread 65x5x30x100mm -760 mm Lg. x244 mm – 48 pcs. As per the drawings for ARAMCO Strd.

M. S. Al-Suwaidi Industrial Services Co. Ltd. For Riyad Refinery Project

7/2009

8/ 2009

20,400 SAR

57

Design, Supply, Fabrication & Installation of ALUMINUM Cage & Ladders for Maintenance Work 05 Units up to 48 Floors

Al-Suwaiket Trand. & Cont. Co. – Khobar at

DEHRAN TOWER

3/2009

12/2009

367,030

SAR

 

SUMMARY OF SUCCESSFULLY ACCOMPLISHED & RUNNING SUPPLY ORDERS IN GCC / BAHRAIN

 

01

Supply of Carbon Steel & Stainless Pipes & Fittings regular contract.

Gulf Temperature Sensors W.L.L.-Bahrain

2010 to 2010

500,000.0
BHD

02

Supply of Electro Mechanical (All type of Pipes & Structural, all kind of Industrial Electrical Items) for LBOP Project on regular supply basis.

Samsung Engineering Ltd. Co. - Bahrain

2010

To

 2010

650,000.0
BHD

-UNDER UPDATING-

 

 